• Skip to primary navigation
  • Skip to main content
  • Skip to footer

+65 62532461

enquiries@dml.com.sg

  • Facebook
  • Google+
  • Instagram
  • Twitter
  • YouTube
DML Trading

DML Trading

Singapore's Leading Distributor of Steel Cylinders and Industrial Gas Equipement

  • Home
  • About
  • Our Product Range
  • News
  • Services
  • Brands
Contact Us

West Africa’s first LNG plant inaugurated

You are here: Home / Industry Feed / West Africa’s first LNG plant inaugurated

August 22, 2019 by realisma

The new plant is being built at the Port of Akonikien, on Equatorial Guinea’s mainland, by local contractor Elite Construciones.

With a storage capacity of 14,000 cubic metres in 12 bullet tanks, it is the first of its kind and allows LNG to be distributed on the mainland.

Along with the storage and regasification infrastructure, Elite is also installing a truck loading station and 12km of gas and diesel pipelines.

Making the announcement during a visit in Kogo, at the border with Gabon, H.E. Gabriel Mbaga Obiang Lima, Minister of Mines and Hydrocarbons, said the terminal is the first of many upcoming projects under the LNG2AFRICA initiative.

“LNG2AFRICA has a clear objective of developing small-scale LNG projects to supply gas to countries and regions with limited infrastructure,” declared Minister Obiang Lima.

“At a time when Africa’s large-scale LNG projects are making headlines, let’s remind ourselves that smaller-scale projects addressing the needs of energy-deficient regions provide opportunities to monetise our gas for our economies, and to mobilise our local companies around key infrastructure projects for the region.”

Source: African Energy Chamber

The Akonikien project is an example of a cost-efficient and clean energy solution to the energy needs of mainland Equatorial Guinea. Once stored and regasified, gas will be transported by trucks and pipelines to various industries such as power and cement.

The project’s infrastructure notably includes the world’s largest factory-built cryogenic bullet tanks, built by US company Corban Energy Group.

“Each tank alone will take about 12 hours to move the thousand metres from the port to the new plant,” explained Marisol Ovono Nchama, CEO of Elite Construcciones, main contractor on the project.

“Elite Construcciones has worked closely with German companies Noordtec and ESC on the design and construction of the plant, and we are all very proud to be part of this achievement and look forward to more LNG2AFRICA projects,” she added.

Category iconIndustry Feed Tag iconindustry news

Subscribe to our newsletter

Get the latest posts delivered right to your inbox

Let us help you with your industrial needs.

Contact us directly and let our experienced team help you with your needs.

Footer

Customer Service Satisfaction

The leader in cylinder and regulator suppplies.

+65 62532461

enquiries@dml.com.sg

DML Trading Pte Ltd 1003 Toa Payoh Industrial Park
#05-1517
Singapore 319075

Newsletter

Get the latest news, events and announcements straight to your inbox.

  • Facebook
  • Google+
  • Instagram
  • Twitter
  • YouTube

Copyright © 2022 DML Trading Private Limited All rights reserved. Return to top