• Skip to primary navigation
  • Skip to main content
  • Skip to footer

+65 62532461

enquiries@dml.com.sg

  • Facebook
  • Google+
  • Instagram
  • Twitter
  • YouTube
DML Trading

DML Trading

Singapore's Leading Distributor of Steel Cylinders and Industrial Gas Equipement

  • Home
  • About
  • Our Product Range
  • News
  • Services
  • Brands
Contact Us

NASA reschedules Artemis I launch

You are here: Home / Industry Feed / NASA reschedules Artemis I launch

September 15, 2022 by realisma

Marking the first integrated flight test of the Space Launch System rocket and Orion spacecraft beyond the Moon, the Artemis I launch will represent a moment of space history.

As a result of the previous aborted missions, NASA on Monday (12th Sep) said it will conduct the demonstration test no earlier than 21st September.

It has updated its request for launch opportunity to 27th September, with a potential backup opportunity of 2nd October currently under review.

NASA had to abort the previous launch dates as a result due to a liquid hydrogen leak.

Speaking at the time, Charlie Blackwell-Thompson, NASA’s Artemis Launch Director, said teams encountered a liquid hydrogen leak while loading the propellant into the rocket’s core stage.

He also reported that multiple troubleshooting efforts to address the area of the leak, by reseating a seal in the quick disconnect where liquid hydrogen is fed into the rocket, did not fix the issue.

Read more: Aborted Artemis launch thrusts hydrogen safety into global spotlight

Read more: In focus… Industrial gases and space exploration

While it can’t definitively be said what caused the leak, attention is focusing on inadvertent over-pressurisation of the hydrogen line early morning, and incorrect commands to the wrong valve, according to reports.

Engineers attempted to flush helium through the line but without success.

gasworld understands that Artemis I teams spent the weekend completing repair work to the area of the hydrogen leak, reconnecting the ground – and rocket – side plates on the quick disconnect for the liquid hydrogen fuel feed line, where two seals were last week replaced.

NASA has said that teams will this week conduct tests at ambient conditions to ensure there is a tight bond between the two plates before testing again during the cryogenic tanking demonstration and begin preparations for test.

Both liquid oxygen and liquid hydrogen will be loaded into the core and intimin cryogenic propulsion stage of the SLS as part of the demonstration. This will enable NASA to see whether the previously detected leaks have been repaired successfully.

If the launch goes ahead as planned on 27th September, Artemis I is expected to land on 5th November.

Category iconIndustry Feed Tag iconindustry news

Subscribe to our newsletter

Get the latest posts delivered right to your inbox

Let us help you with your industrial needs.

Contact us directly and let our experienced team help you with your needs.

Footer

Customer Service Satisfaction

The leader in cylinder and regulator suppplies.

+65 62532461

enquiries@dml.com.sg

DML Trading Pte Ltd 1003 Toa Payoh Industrial Park
#05-1517
Singapore 319075

Newsletter

Get the latest news, events and announcements straight to your inbox.

  • Facebook
  • Google+
  • Instagram
  • Twitter
  • YouTube

Copyright © 2023 DML Trading Private Limited All rights reserved. Return to top